Current-carrying capacity of transmission lines obtained by setting conservative weather conditions limits the exertion of line heat capacity most of the time. 通过设定保守环境条件而确定的输电线路允许载流量在大部分时间内限制了线路热载荷能力的发挥。
The company, which started eight years ago as a reseller of international line capacity, now helps to connect Chinese telecoms operators with their international counterparts through its hub service. 该公司成立于8年前,最初是一家国际通信线路容量转销商,目前通过其枢纽服务,帮助中国的电信运营商与国际同行互连。
Designing Application of Head-proof Aluminium Alloy Wire in Overhead Transmission Line Capacity Increasing Reform 耐热铝合金导线在高架空输电线路增容改造的设计应用
Methods to Improve the One Line Fairway Capacity of Bulk Port 散货港区提升单线航道通过能力的方法研究
Study on the empty cars distribution model with variable cost parameter and line carrying capacity 线路通过能力限制下的变参数空车调配模型研究
Planning and Research of Production Line with Capacity of Annual 600 Thousands CFC-free Refrigerators 60万台全无氟电冰箱生产线规划分析与研究
By taking S001 body production line as an example, the normal procedure of Body Line Capacity improvement is discussed, and some critical steps are also pointed out. 结合某车型(下称S001)车身生产线提速的例子,阐述实施车身生产线提速的一般过程,并表达了须要注意的主要事项。
Assessment of ecological sustainability reveals the base line of capacity of regional sustainable development. 生态可持续性评价揭示了区域可持续发展能力的基线尺度。
A Simulated Annealing Approach to Railroad Operating Problem with Limits on Yard and Line Capacity 线路与编组站能力限制下的车流组织模型与模拟退火方法
Study on the Equipment Method of Bus Line Capacity 公交线路运力配备方法研究
The Dynamic Thermal Circuit Rating ( DTCR) of the transmission lines can be considered as the calculation basis for the increase of the transmission line capacity. 输电线动态热容等级DTCR可用作提高输电线路的传输容量的核算依据。
Calculation of benefit from interconnecting North China power system with central China power system and analysis of required tie line capacity 多地区电力系统频率和交换功率的分散最优控制华北和华中电网联网效益计算与联网规模分析
Based on these points, improving vehicle load is the most effective measure to advance railway line capacity, and it is also an important resort to improve the indexes of the railway operation to depress the transport cost. 提高货物列车重量不仅是提高铁路输送能力的最有效的措施之一,而且也是改善铁路工作运营指标和降低运输成本的重要手段。
Modeling line capacity planning for PWB assembly systems and its approximate solution algorithms PWB装配线综合生产能力计划模型及其近似求解算法
Firstly the bus stop that limited the bus transit line capacity is studied. 首先对制约城市公交线路通行能力的公交车站进行研究。
Inadequate capacity of the road network in ours country, freight transport strong demand, which led to tension in a part of line capacity, part of the line capacity idle. 我国路网能力不足,货物运输需求旺盛,这种情况导致一部分线路能力紧张,一部分线路能力闲置。
And we can balance the product quality, the production efficiency and the technology investment and enhance the production line capacity without adding new equipment, this will maximize the production benefits. 公司在不增加新设备的条件下完成了生产线产能的提升,实现了产品质量、生产效率和技术投资三个方面的平衡,将生产利益最大化。
The simulation proved that this method can effectively improve the line current capacity. 仿真证明,此方法可有效提高线路载流能力。
Study on novel train operation control method is an important way to increase line capacity and reduce energy consumption. 研究新的列车运行控制方法是进一步提高线路通过能力和减少能源消耗的重要手段。
We then analyzed the impacts of train operation structure on line capacity from train timing, headways and train bundling perspectives. 从列车开行时刻、列车开行间隔和列车成组开行等三个方面分别分析列车开行结构对区间通过能力的影响。
For avoiding unfocused investment, much more testing and evaluation is needed on the high-speed rail line capacity, control effectiveness and performance as well as economic and social benefits at the same time. 与此同时,就有必要对高速铁路的线路通过能力、控制效果和性能、经济效益和社会效益等进行大量的检测和论证,以免盲目投资。
The concept, configuration and characteristic of rail freight transportation corridors are relatively integrally discussed in the network design theory of rail freight transportation corridor, and a new thought was put forward: the railway line capacity is discretely changing under different rail corridor construction projects. 在铁路货运通道网络设计理论方面,比较完整地论述了铁路货运通道的概念、形态及其特点,提出了在不同铁路通道建设项目选择下,其通过能力是呈现离散性变化的。
Less ability to put forward the concept of skylights, analyzed and vertical V-type skylight skylight set on the line capacity and speed of train travel, and the establishment of a skylight time on the line capacity of models. 提出了天窗扣除能力的概念,重点分析了V型天窗及垂直天窗的设置对线路通过能力及列车旅行速度的影响,并建立了天窗开设时段对线路通过能力的影响模型。
Finally, we proposed suggestions and measures to improve utilizing the line capacity of "Yingtan-Xiangtang" section. 最后,提出相应改善通过能力利用情况的运输组织措施及建议。
Factors which affect small signal stability of Southern Power Grid are summarized, including the HVDC model, HVDC transmission line capacity, HVDC modulation and small hydropower unit modeling. 从直流系统模型、直流系统输送容量、直流调制和小水电机组建模四个方面总结了南方电网小干扰稳定分析的影响因素。
Explores computational theory and method of edge weights of military distribution network in-depth, which are road real-time line capacity and road travel time. 较深入探讨了军事配送运输网络道路实时通行能力、路段行程时间等边权的计算理论与方法。
Improving the conductor allowable temperature is one of the main ways to improve the Transmission Line Capacity. 提高导线允许温度,是提高输电线路输送容量的主要途径之一。
In order to achieve sustainable development, urban rail transit system needs to further increase line capacity and reduce energy consumption on the premise that safety is guaranteed. 为了实现可持续发展,城市轨道交通系统需要在保证安全的前提下进一步提高线路通过能力和减少能源消耗。
Therefore, it is necessary to improve lines and promote the line capacity. 因此,进行生产线体现场改善,提升生产线产能势在必行。
With shortening of the interval of the train following, some complex phenomenon of rail traffic flow have more and more impact on traffic safety and line capacity, such as the mutually influence of trains, train following operation and delay propagation of trains. 随着列车运行间隔的不断缩短,列车间相互作用、列车追踪运行、列车运行延误以及列车延误传播等轨道交通流现象对行车安全和线路通过能力的影响不断扩大。